Defect Elimination

Home/Defect Elimination

Failure Reporting And Corrective Action System (FRACAS)

Using a System to Record, Report And Eliminate Defects

Why is that some organization seem to break the reactive cycle and others don’t?  After all most organizations have a PM program and some form of a planning and scheduling program right?   The key difference between those that do is their ability to use their failure data and systematically eliminate defects and issues from the processes and equipment.  This doesn’t mean adding a new PM everytime some fails, which just won’t work.

To eliminate the defects and issues, the organization needs to collect meaningful data to […]

By |2019-04-19T15:49:40-04:00March 27th, 2017|CMMS, Data Standards, Defect Elimination, FRACAS, Reliability Engineering|Comments Off on Failure Reporting And Corrective Action System (FRACAS)

Using Simplified Technical English to Write Effective Maintenance Procedures

Reduce the Variability in Your Work Routines and Procedures

Based on our understanding of the six failure patterns, we can see that there is a large probability of failure when the equipment is first installed and started up.   One of the Englisch causes of this increase in probability is the fact that the equipment was not installed or maintained correctly.  This may be due to the installer or maintainer not using or following procedures.  Having procedures is the first step to reducing these failures, but the procedures must be written in a clear, […]

By |2019-04-19T15:49:41-04:00March 20th, 2017|Adherence to Standards, Capability, Capability, Knowledge, People, Knowledge Management, Organizational Management, Performance Management, Standard Work, Work Instructions, Work Management, Work Planning, Work Quality|Comments Off on Using Simplified Technical English to Write Effective Maintenance Procedures

Establishing the Frequency of Failure Finding Maintenance Inspections

Preventing The Consequences Of A Hidden Failure From Devastating Your Organization.

Ever wonder how some of the worst industrial disasters occur?  It is usually the result of multiple failures.  Failure of the primary system and failure of the protective systems.   Ensuring the protective system(s) are not in a failed state should be of utmost importance to any organization.  But how often should we test the protective systems to ensure the required availability?

Establishing the correct frequencies of the inspection/ testing activities of these protective system(s) is critical to not only the success but safety […]

By |2019-04-19T15:49:44-04:00March 13th, 2017|Equipment Strategy, Reliability Centered Maintenance, Reliability Engineering, Review RCM|Comments Off on Establishing the Frequency of Failure Finding Maintenance Inspections

Establishing Fixed Time Maintenance Intervals

How to Select The Optimum Fixed Time Maintenance Intervals

Think about your maintenance program. How often are your PMs scheduled?  How were those frequencies established?   If you are in the majority, the chances are that the frequencies were either established from the OEM manual, or by someone in the department without data.

Establishing the correct frequency of maintenance activities is critical to the success of any maintenance program.   Too infrequently and the organization is subjected to failures, resulting in poor operational performance.  Too frequently, and the organization is subjected to excess planned downtime and […]

By |2019-04-19T15:49:45-04:00February 27th, 2017|Equipment Strategy, Reliability Centered Maintenance, Reliability Engineering|Comments Off on Establishing Fixed Time Maintenance Intervals

The P-F Curve Revisited

Understanding The Importance of Proper Equipment Installation

There has been much discussion (and often debate) around the P-F curve.  The P-F curve illustrates the relationship between the warning signs that are detectable by various technology or methods and the progression of the failure.   What is often not discussed and overlooked, is what happens before the equipment starts to deteriorate.

If the ultimate goal of an organization is to be proactive and ensure equipment uptime, wouldn’t the organization want to prevent the equipment from failing in the first place and not catch it after it […]

By |2019-04-19T15:49:50-04:00February 13th, 2017|Adherence to Standards, Early Equipment Management, Equipment Specifications, Work Quality|Comments Off on The P-F Curve Revisited